Lee Hunter Elementary
- Current facility was built in 1954.
- Numerous outside entrances
- Poor HVAC system with window units
- Insufficient electrical grid and system
- No dedicated cafeteria or gymnasium
- Currently 350 students
New Lee Hunter Elementary
- Space for 460 students
- Dedicated cafeteria
- Dedicated gymnasium
- Number of classrooms
- Modernized safety and security systems
- Increased traffic flow
Cost $13.4 million
(click to enlarge)
C Building
- Current C Building built in 1960
- Plumbing system is outdated
- Classrooms spaces are insufficient for safety and learning
- Needed library upgrades
- Leaking roof
New C Building
- 12 enclosed classrooms
- New library
- Technology upgrades
- Access from the Math and Science Center and A Building
Cost $6.6 million
(click to enlarge)
Kindergarten Safe Space
- Construct a multi-purpose facility adjacent to current Kindergarten Center
- Building would meet requirement for safety and inclement weather standards
- Potential SEMA/FEMA matching grant for construction (75%)
- Sikeston R-6 provides matching funds of $400,000
- Part of Master Facilities Plan 2
- Not in $21.6 million Phase 2 total
Cost $400,000
(click to enlarge)
Removing Outdated Facilities
Raze current Lee Hunter Elementary to construct new school on current site (2020)
Cost $500,000
Raze current Matthews Elementary after serving as temporary Lee Hunter location during construction (2021)
Cost $500,000
Raze current C Building (2021)
Cost $600,000